NEW SPILLWAY WEIR FOR ICE HARBOR UNDER CONSTRUCTION

Sitting in a Vancouver, Wash. shipyard is a 1.7 million pound, 105-foot by 75-foot steel structure that in March 2005 will float to Ice Harbor Dam on the lower Snake River.

A U.S. Army Corps of Engineers contractor is well along in the construction of the federal Columbia River power system’s next removable spillway weir (RSW).

Read the Full Article

Login to your account or Become a Member

More news from CBB: