Wind energy projects in the Bonneville Power Administration system have curtailed 6.2 percent of their scheduled output since BPA began intermittent limits on coal, natural gas and other thermal and wind generation to help manage an oversupply of electricity during the highest Columbia River runoff in more than a decade.