A $50 million remodeling project at Bonneville Dam’s second powerhouse is expected to draw more migrating juvenile salmon and steelhead away from hydro turbines and deliver them to a safer place in the Columbia River below.
Construction is all but complete on the modification of the powerhouse’s trash and ice chute, which has long been a preferred route past the dam.