8. LOWER SNAKE DISSOLVED GAS TMDL PLAN READY FOR REVIEW

The lower Snake River dissolved gas Total Maximum Daily Load (TMDL) plan is ready for review.

The Washington Department of Ecology will unveil its plan to improve the levels of dissolved gas in the section of river that is on its 303(d) list and consistently out of compliance with the state’s 110 percent TDG limits due to operations at U.S. Army Corps of Engineer dams, at a public meeting in Kennewick, Wash. March 25.

Read the Full Article

Login to your account or Become a Member

More news from CBB: