Grant PUD Says Long-Ago Mathematical Error At Root Of Wanapum Dam Problem, Sets Course For Fix

“A mathematical error during the pre-construction design of Wanapum Dam” on the mid-Columbia River has been determined as the primary contributing factor to a fracture discovered this late winter that had developed within the dam’s spillway and forced major changes to hydro and fish passage operations there.

Read the Full Article

Login to your account or Become a Member

More news from CBB: